AK Learning Nepal

  Thursday 16 October 2025 / 01:43 PM

KTFT Exercise – Reading Comprehension

Kathmandu-Terai/Madhesh Fast Track (KTFT) – Complete Reading Comprehension Solution

The Kathmandu-Terai/Madhesh Fast Track (KTFT) is a project of national pride in Nepal. It connects Khokana (Lalitpur) to Nijgadh (Bara) and aims to revolutionize travel, trade, and development across the country. This post includes all exercises and answers for better understanding and exam preparation.

A. Find Words Similar in Meaning

1. humongous →
mega
2. thoroughfare →
highway
3. significance →
importance
4. annex →
connect
5. entire →
total
6. approximate →
estimated
7. profit →
benefit
8. monetary →
economic

B. Find Opposite Words

1. spoil →
benefit
2. curse →
blessing
3. adversity →
prosperity
4. proximity →
distance
5. expenditure →
saving
6. negative →
positive
7. compulsion →
option
8. easy →
complicated

C. Match Column A with Column B

a. transportation →
sending goods or people from one place to the other place
b. smooth →
without problems or difficulties
c. shipping →
transportation of goods by sea or some other means
d. settle →
make one’s permanent home somewhere
e. realisation →
an act of becoming fully aware of something
f. potentially →
with the capacity to develop or happen in the future

D. True or False

a. KTFT is an infrastructure of national pride. →
True
b. East west highway connects Bara district with Lalitpur. →
False
c. The fast track has enhanced the country’s economic growth. →
False
d. Tourists from India will get a good opportunity to travel through fast track. →
True

E. Reorder the Sentences

Correct Order:
1. c → The average design speed of KTFT is 70 km/hr.
2. d → The distance from Kathmandu to Terai will be limited to an hour.
3. a → KTFT has to promise to accelerate socio-economic revolution in Nepal.
4. b → After the operation FT, the next challenge will be the formation of link roads.

F. Answer the Following (Word-Mixed Questions)

a. new totally be the to will people What of Nepal?
The technology of high bridges and twin tunnels.
b. importance KTFT’s is What?
It will boost economy, create jobs, save fuel, reduce traffic, help in emergencies.
c. pride national of infrastructure an is What?
KTFT.
d. connection length its and is What with?
72.5 km – connects Khokana (Lalitpur) to Nijgadh (Bara).
e. open connectivity KTFT-enhanced can up What?
Better travel options for tourists from India and beyond.
f. do fast will the What track?
Reduce time, save money, help country grow.
g. case in calamities natural of KTFT used be can How?
To send food, water, medicine fast.
h. sure proximity this to is have What?
Positive economic impact.
i. burdens KTFT of some are What?
Accidents, deforestation, pollution, weak link roads.
j. form full KTFT of is What?
Kathmandu-Terai/Madhesh Fast Track.
k. speed design average KTFT of is What?
70 km/hr.
l. opportunity job new the will What do?
Improve family economic condition.
m. create to sure project this is What?
Jobs for youth.
n. benefited be also traders local can How?
Cheaper transport → lower goods cost → better business.
o. promise to KTFT has accelerate What?
Socio-economic revolution in Nepal.
p. benefit KTFT of a is What?
Daily fuel saving over 5 billion rupees.
q. operation its after journey of timing the be will What?
1 hour from Kathmandu to Terai.
r. get certainly KTFT in involved people Nepali the will What?
Chance to learn new skills and technology.
s. saved be potentially could saving fuel daily the much How?
More than 5 billion rupees.
t. facilitate will project the Terai of people the fields Which?
Health, education, jobs, new markets.
u. operation KTFT of after challenge next the be will What?
Building link roads.
v. degradation environmental for causes major the of one be will What?
Air pollution from dust, blasting, quarrying.
w. reduced be valley Kathmandu the of congestion increasing over an can How?
People live outside, come in 1 hour → less city density.
Note: KTFT aims to revolutionize Nepal’s transportation sector, boost trade, create employment, and minimize travel time. However, it must be managed carefully to prevent environmental damage and ensure sustainability.

Conclusion

The Kathmandu-Terai/Madhesh Fast Track is a landmark project for Nepal’s development. Once operational, it will transform communication, trade, and tourism between the hills and plains. Every Nepali will directly or indirectly benefit from its success.

Leave a Reply

Scroll to Top